Marathon Oil

marathon1-th

Scope of Work: Asbestos and Lead Abatement, Mecury Cleanup. EDI removed asbestos, lead and mercury contamination from various buildings and site areas in preparation for site demolition. Enclosed, wet and excavated asbestos – containing soils from approximately a 20,000 square foot area. Owner and Location: Marathon Oil Company 7400 S. Broadway Littleton, CO 80122 Rick … Read More

University East Pavilion Hospital

cu-th

Scope of Work: Asbestos Abatement, Building Demolition, Universal Waste. This project required complete abatement of asbestos, lead, regulated building materials and the demolition of the entire structure. The asbestos abatement work at the former East Pavilion Hospital consisted mostly of TSI pipe and fittings. 7,000 linear feet of pipe was removed along with 3,100 fittings. … Read More

Steamboat Springs

steamboat1-th

Scope of Work:  Asbestos and Regulated Building Materials. EDI was contracted to complete the removal and disposal of asbestos-containing building materials and regulated building materials. EDI performed the removal of these materials in 7 different facilities located at the base of the Steamboat Springs Ski Resort. Work areas consisted of multiple shops, restaurants, and condos … Read More

St. Anthony’s

st-anthony1-th

Scope of Work: Hazardous Material Remediation. EDI successfully excavated, abated and disposed of just under 17,000 cubic yards of lead and asbestos contaminated soils. Additionally, EDI excavated and removed approximately 7,000 lineal feet of contaminated transite pipe for disposal. All contaminated soils and pipe were properly manifested per State and Federal regulations for disposal. EDI … Read More

Wal-Mart

walmat-th

Scope of Work: Asbestos Abatement, Regulated Building Materials. Construction of a 226,000 square foot Wal-Mart Store in Lakewood, Colorado required removal of asbestos and regulated building materials from 27 structures prior to demolition. EDI’s crew removed asbestos flooring, acoustical spray-on fire-proofing, pipe insulation brick and block coating and contaminated soils. EDI completed all 22 buildings … Read More

Villa Italia Mall

villa1-th

Scope of Work: Asbestos Abatement, Universal Waste. EDI performed the asbestos abatement and removal of the regulated building materials from the entire Villa Italia Mall, including four surrounding buildings. The asbestos abatement work for this project included removal and disposal of 14,000 square feet of cinder block coating, 14,000 square feet of transite, all of … Read More

Lockheed Martin

lockheed1-th

Scope of Work: Hazardous Material Remediation. EDI was contracted to decontaminate numerous hazardous substances remaining in the process piping and related apparatus associated with the M-19 Hydrostat Test Facility prior to demolition. Contaminates Remediated: Chromium Lead Sulfuric Acid Hydrogen Sulfide Asbestos EDI’s flawless safety record was instrumental to the award of this contract. Location: Lockheed … Read More